Jimmy Carter Just Built A Massive Solar Farm To Power Half His City
July 18, 2017
Former U.S. President Jimmy Carter leased 10 acres of land in Plains, Georgia, to build a solar farm with the capacity to meet more than 50 percent of the energy needs of his hometown.

Working with SolAmerica, the 1.3 megawatt solar farm will supply more than 55 million kilowatt hours of clean energy to the residents of Plains — more than half the town's annual electrical consumption.
"Rosalynn and I are very pleased to be part of SolAmerica's exciting solar project in Plains," Carter said in a statement. "Distributed, clean energy generation is critical to meeting growing energy needs around the world while fighting the effects of climate change. I am encouraged by the tremendous progress that solar and other clean energy solutions have made in recent years and expect those trends to continue."
Watch the video here:
Dogs Are Forced To Wear The Things They Steal — And It’s Hilarious
Meet Nazgul: The Dog Who Crashed An Olympic Ski Race And Nearly Won
People Are Submitting Photos of Their Cats’ ‘Jobs’— And We Can’t Stop Laughing
She Was Feeling Low On Confidence, So Her Classmates Covered Her Desk In Sticky Notes
A Childhood Bond Reunited: Firefighter Saves The Horse That Taught Him To Ride
She Collects Trash 5 Days A Week With Her Dog — So A Resident Gifted Her Dog A Matching Vest
Mom Was About To Miss Her Flight, So A Stranger Picked Up Her Kid And Ran With Her
She Gave Her Dad The One Thing He’d Been Searching For His Whole Life
Son Stops Mid Race To Give His Mom A Kiss During The Special Olympics
Reporter Asks Eileen Gu 'Do You Think Before You Speak?' — Her Answer Is Going Viral
He Went Back To Pay The Man Who Helped Him — But That’s Not What Happened
